Rail Vehicle Technology
- repair and maintenance of freight wagons
- Brake inspections on freight wagons Br 1 / Br 2 / Br 3 by qualified personnel
- Reconditioning of bogies according to maintenance stages D1, D2 and D3
- extension and vehicle inspections §32 EBO
- Limited-term work on freight wagons
- Straightening work on freight wagons
- welding work ISO 15085-2
- Determination of the wheel contact forces (vehicle weighing)
- Wood processing
- Sheet metal working
- colour renovation and colouring
- Sandblasting work on request
- Wheelset reconditioning by subcontractors
- Spare parts procurement

- reconstruction / modernisation
- necessary constructional and technical adjustments according to order documents
- Dismantling of existing superstructures
- Blasting and derusting with the corresponding colouring
- Welding work, flame-cutting work, straightening work
- Mobile assembly in track / mobile maintenance
- Replacement of brake pads
- Lubrication and greasing work
- +3M extensions
- Graffiti Removal
- Brake revision BR0 (PDR5) by qualified personnel
- welding and gluing of PVC tarpaulins
- Repair and replacement of moving parts on bodies / containers
- GPS module mounting
- Testing and replacement of electrical components
- Exchange of parts of the pulling and pushing device
- Labeling work
- Gluing work (rubber pads, edge protection)
- Measurement work on wheelsets including protocol
According to the VPI, subsequent work on the track is excluded.
- wheelset exchange in the track without agreement of the ECM (wheelsets may only be exchanged with the consent of the ECM)
- Performance of welding work in the track